A gas boiler needs a small electrical supply for controls and the pump. It is a good essential load if the backup is designed for it.

On the actual building

An electric boiler or a heat pump is a completely different load and may be too large for the battery. The cupboard, the supply and the tariff decide it. A national package price skips all three.

In most single-phase houses in Britain, 5 kW sits above the 3.68 kW G98 line, so this wants a G99 application before anyone energises it. Export can still be capped. Agree that before the inverter is ordered. The figure uses 13.5 kWh and 6 kWp, which is enough to tell two quotes apart if they assumed something else.

The money

Take a 13.5 kWh pack, cycled about 280 times, at 90% round trip. Charge at 13.0p, and value what comes back at 27.2p. Export given up is priced at 6.0p. About 2646 kWh a year of the charge is treated as spare solar from 6 kWp that might otherwise have been exported. Delivered energy is about 3402 kWh. After charging cost and lost export, the figure saves about £651 a year. Set that against £8,805 fitted, which is a September 2026 illustration at the temporary 0% residential rate, not a quote. That is a simple payback of about 13.5 years on these assumptions. Nudge the night rate up by 4p and see if you still like it.

Where the job is a qualifying install in a home, the 0% rate runs to 31 March 2027 and is due to become 5% after that. This figure prices the work at £8,805 on that basis. It does not apply to a shop, and it does not apply to a battery you buy and fit yourself.

When to stop

I would not compare a £8,805 headline with another until usable kWh and the fate of any existing inverter match.

If the only place for a 13.5 kWh cabinet is an escape route, a hot boiler cupboard or an unapproved balcony, stopping is a successful survey.

Before a deposit, I would want usable capacity, the warranty counterparty and a G99 note for this 5 kW inverter. The cupboard has to be a place you can stand in, at a temperature the datasheet allows. A five-minute video is not that.

Common questions

Is the price on this page a quote?

No. £8,805 is a September 2026 illustration for a 13.5 kWh example at the temporary 0% residential rate. Your survey replaces it.

Will it stay on in a power cut?

Only if a gateway or essential-load board was designed and paid for. A standard grid-tied battery turns off with the grid. On this 13.5 kWh example the inverter is 5 kW, and backup is still a separate line.

What paperwork should I keep?

Keep the MCS certificate where the job is certified, the electrical certificate, the DNO record, the schematic, the warranty registration and a photo of the schedule. For an illustrated £8,805 job, that folder is part of what you bought.

What if the cheap rate is not 7p?

Then the figure changes. This page used 13.0p as a charge rate and 27.2p as the rate avoided. A smaller gap means a worse payback. Read the live tariff.