Local Battery Installers Get a quote
  1. Front
  2. Guides
  3. A battery and a hot tub or pool pump

Homes · Site note

A battery and a hot tub or pool pump

Updated

A home battery cabinet in a British utility room, next to the consumer unit
A home battery cabinet in a British utility room, next to the consumer unit

These are large, dumb loads. They can swallow a battery and a cheap overnight window.

On the actual building

Put them on a timer that matches the tariff, and do not expect a 10 kWh battery to heat a tub. The battery is for the house, not for the water. The cupboard, the supply and the tariff decide it. A national package price skips all three.

In Sheffield, on Northern Powergrid, 5 kW sits above the 3.68 kW G98 line, so this wants a G99 application before anyone energises it. Export can still be capped. Agree that before the inverter is ordered. The sketch uses 8 kWh and 2.5 kWp, which is enough to tell two quotes apart if they assumed something else.

If the house is in Sheffield

Sheffield is only an example for "A battery and a hot tub or pool pump", not the only place the point applies. Northern Powergrid would be the network if the survey were there, and the cupboard rules would still win.

A sketch of the money

Take an 8 kWh pack, cycled about 300 times, at 90% round trip. Charge at 9.0p, and value what comes back at 28.4p. Export given up is priced at 8.0p. About 857 kWh a year of the charge is treated as spare solar from 2.5 kWp that might otherwise have been exported. Delivered energy is about 2160 kWh. After charging cost and lost export, the sketch saves about £420 a year. Set that against £5,686 fitted, which is a September 2026 illustration at the temporary 0% residential rate, not a quote. That is a simple payback of about 13.5 years on these assumptions. Nudge the night rate up by 4p and see if you still like it.

Where the job is a qualifying install in a home, the 0% rate runs to 31 March 2027 and is due to become 5% after that. This sketch prices the work at £5,686 on that basis. It does not apply to a shop, and it does not apply to a battery you buy and fit yourself.

When to stop

I would not pay the bulk of £5,686 before the DNO route for a 5 kW inverter is known.

If the only place for a 8 kWh cabinet is an escape route, a hot boiler cupboard or an unapproved balcony, stopping is a successful survey.

Before a deposit, I would want usable capacity, the warranty counterparty and a G99 note for this 5 kW inverter. The cupboard has to be a place you can stand in, at a temperature the datasheet allows. A five-minute video is not that.

Common questions

Is the price on this page a quote?

No. £5,686 is a September 2026 illustration for a 8 kWh example at the temporary 0% residential rate. Your survey replaces it.

Will it stay on in a power cut?

Only if a gateway or essential-load board was designed and paid for. A standard grid-tied battery turns off with the grid. On this 8 kWh sketch the inverter is 5 kW, and backup is still a separate line.

What paperwork should I keep?

Keep the MCS certificate where the job is certified, the electrical certificate, the DNO record, the schematic, the warranty registration and a photo of the schedule. For an illustrated £5,686 job, that folder is part of what you bought.

What if the cheap rate is not 7p?

Then the sketch changes. This page used 9.0p as a charge rate and 28.4p as the rate avoided. A smaller gap means a worse payback. Read the live tariff.

Sources

Want a price for your house?

The figures above are a rough guide. An installer still needs to see your fuse board, where the battery will go, and whether you want power during a blackout.

Get a quote
Get a quote