You need the serial number, the commissioning date, the installer, the error log and proof of purchase. The claim may sit with the installer, the distributor or the manufacturer, and those are different if the manufacturer has failed.

Separate a fault from a setting

Start with the installer. Keep copies. Do not accept a verbal 'out of warranty' without the term that says so. The first suspects are a schedule, a reserve held for backup, or a CT clamp on the wrong cable. All three look like a dead battery.

Note the state of charge, the time, whether the grid is up, and any code. Do not start from "it doesn't work", and do not open DC isolators you were not shown.

Heat, cold and the cupboard

Many LFP packs refuse to charge in a hard frost and will still discharge. Lofts do the opposite in a heatwave. If the trouble tracks the weather, read the datasheet before you demand a new stack. A 10 kWh pack in the wrong cupboard is a siting fault, not a cell fault.

Take a 10 kWh pack, cycled about 280 times, at 90% round trip. Charge at 11.0p, and value what comes back at 27.2p. Export given up is priced at 6.0p. About 1600 kWh a year of the charge is treated as spare solar from 4 kWp that might otherwise have been exported. Delivered energy is about 2520 kWh. After charging cost and lost export, the figure saves about £477 a year. Set that against £6,880 fitted, which is a September 2026 illustration at the temporary 0% residential rate, not a quote. That is a simple payback of about 14.4 years on these assumptions. Nudge the night rate up by 4p and see if you still like it.

Who you phone

Where the job is a qualifying install in a home, the 0% rate runs to 31 March 2027 and is due to become 5% after that. This figure prices the work at £6,880 on that basis. It does not apply to a shop, and it does not apply to a battery you buy and fit yourself.

I would not treat backup as included on a 10 kWh quote unless the circuits are listed. Start with the installer on the certificate. A forum is not a warranty desk.

Before a deposit, I would want usable capacity, the warranty counterparty and a G98 note for this 3.6 kW inverter. The cupboard has to be a place you can stand in, at a temperature the datasheet allows. A five-minute video is not that.

Common questions

Is the price on this page a quote?

No. £6,880 is a September 2026 illustration for a 10 kWh example at the temporary 0% residential rate. Your survey replaces it.

Will it stay on in a power cut?

Only if a gateway or essential-load board was designed and paid for. A standard grid-tied battery turns off with the grid. On this 10 kWh example the inverter is 3.6 kW, and backup is still a separate line.

What paperwork should I keep?

Keep the MCS certificate where the job is certified, the electrical certificate, the DNO record, the schematic, the warranty registration and a photo of the schedule. For an illustrated £6,880 job, that folder is part of what you bought.

What if the cheap rate is not 7p?

Then the figure changes. This page used 11.0p as a charge rate and 27.2p as the rate avoided. A smaller gap means a worse payback. Read the live tariff.