Quick answer

On a 2016 SolarEdge roof the first question is the generation meter, not the colour of the new cabinet. A Powerwall 3 brings its own inverter. Taking the SolarEdge off the wall can be the right job, and it can also be the job that muddles a Feed-in Tariff.

What is already on the wall

The system in this note is a 2016 SolarEdge inverter with optimisers (small boxes under each panel), a generation meter, and a Feed-in Tariff account that still pays. The inverter is out of its original product warranty. It still starts every morning.

The owner wants backup for the fridge and the router, and a battery big enough to cover a normal evening. They were shown a Powerwall 3 as a single box that replaces the old inverter. They were also shown an AC-coupled battery (a separate pack on the house wiring) that leaves the SolarEdge where it is.

Those are different electrical jobs. Comparing the two brochure prices without saying what happens to the optimisers and the generation meter is how people buy the wrong one.

Two scopes at a glance

This table is a survey shortlist, not a price list. The FIT meter and the roof decide which column is even legal to discuss.

Keep SolarEdge AC-coupled vs Powerwall 3 rip-and-replace
FactorAC-coupled pack (keep SolarEdge)Powerwall 3 hybrid swap
Existing inverterStays on the wallComes off
Roof / optimiser workUsually none if the array is healthyOften scaffold and a plan for optimisers
FIT generation meter riskLower if pack sits on the house sideMust be redesigned so discharge is not counted as generation
BackupOnly with a listed gateway / essential boardOnly with gateway and named circuits
Warranty shapeSolarEdge life + separate battery warrantyOne manufacturer stack
Install complexityLower disruption if the inverter is fineHigher if the roof must be touched
When it winsHealthy 2016 inverter, awkward roofFailing inverter and a clean backup brief

Leaving the SolarEdge in place

An AC-coupled pack sits on the house side of the generation meter. The SolarEdge keeps making solar, the meter keeps seeing only that solar, and the battery charges from the household side. Done carefully, the FIT (Feed-in Tariff) metering story stays intact.

You inherit the old inverter's remaining life. If it fails next year you are into a replacement anyway, and the optimisers may tie you to another SolarEdge inverter rather than any hybrid you fancy.

Backup is not free with this route. The AC-coupled battery still needs a gateway or an essential-load board (a small second fuse board for circuits that stay on) if anything is meant to stay on when the street goes dark. A standard grid-tied pack will switch off with the grid.

Taking it off and fitting a Powerwall 3

Powerwall 3 is a hybrid: one inverter runs both the solar and the battery. The SolarEdge inverter comes off. The optimisers under the panels then need a plan: some can be removed, some designs replace them, and the labour is on the roof, which means scaffold. That scaffold is often the line missing from a 'battery only' price.

The generation meter must still measure eligible solar and not battery discharge. The installer has to show the wiring, not assure you in an email. Ofgem's FIT rules are about what the meter sees. A tidy app does not answer that.

You do get one manufacturer, one app, and a backup design that Tesla documents, provided the gateway and the circuit list are in the quote. You also concentrate warranty and service in one place. If that firm or the product support is awkward in year six, there is no second inverter still running the roof.

The question to ask both quotes

Ask each firm to mark, on one sketch, the generation meter, the supply meter, the old inverter, and the new kit. Ask which devices stay. Ask whether anyone is going on the roof.

Ask for the last similar FIT retrofit they commissioned: the meter arrangement, not a testimonial. A first attempt at a FIT meter on your roof is a risk you can decline.

If the SolarEdge is healthy and the roof is awkward, leaving it and AC-coupling is often the smaller job. If the inverter is already failing and you want backup designed in, the Powerwall route can be the cleaner one. The roof and the meter decide it, not the advert.

Frequently asked questions

Does a Powerwall 3 automatically keep the FIT payments correct?

No. The payments stay correct only if the generation meter still records eligible solar and does not record energy that came from the grid via the battery. The installer has to design that, and you should see it on the schematic.

Can the optimisers stay with a different inverter?

Do not assume it. SolarEdge optimisers are part of that system. A swap to another hybrid often means roof work. Get that written into the quote before you compare it with a battery that leaves the roof alone.

Is backup included with either option?

Only if a gateway or essential-load board is listed, with the circuits named. The Powerwall backup hardware and an AC-coupled gateway are both extra scope. Neither appears because the word battery was used.