If your current inverter is not SolarEdge, ask the installer to price the honest alternative: an AC-coupled battery beside what you have. Match the battery warranty to the inverter warranty already on the wall.
The ownership question
A new 10-year battery on a tired inverter is a sequencing question. Backup is model and backup-interface dependent. Many existing SolarEdge homes were fitted for self-use, not for islanding, and cannot be 'switched on' for backup without extra hardware.
Who it still suits: homes that already have a healthy SolarEdge inverter and want DC-coupled storage without throwing away the optimisers.
A September 2026 figure for SolarEdge Home Battery
Take a 10 kWh pack, cycled about 320 times, at 90% round trip. Charge at 11.0p, and value what comes back at 29.6p. Export given up is priced at 10.0p. About 1829 kWh a year of the charge is treated as spare solar from 4 kWp that might otherwise have been exported. Delivered energy is about 2880 kWh. After charging cost and lost export, the figure saves about £555 a year. Set that against £6,880 fitted, which is a September 2026 illustration at the temporary 0% residential rate, not a quote. That is a simple payback of about 12.4 years on these assumptions. Nudge the night rate up by 4p and see if you still like it.
In most single-phase houses in Britain, 3.6 kW is in the band where G98 connect-and-notify is often enough. Export can still be capped. Agree that before the inverter is ordered. The figure uses 10 kWh and 4 kWp, which is enough to tell two quotes apart if they assumed something else.
At a steady 600 W evening load, 10 kWh lasts about 16.7 hours. A 3 kW kettle only works if the inverter can deliver it. Capacity on the badge does not answer that.
VAT, paperwork, refusal
Where the job is a qualifying install in a home, the 0% rate runs to 31 March 2027 and is due to become 5% after that. This figure prices the work at £6,880 on that basis. It does not apply to a shop, and it does not apply to a battery you buy and fit yourself.
I would not pay the bulk of £6,880 before the DNO route for a 3.6 kW inverter is known.
If you already own SolarEdge Home Battery, do not rip it out because a headline frightened you. Photograph the serial, keep the installer details, and ask them what the warranty path is this month.
Common questions
Is the price on this page a quote?
No. £6,880 is a September 2026 illustration for a 10 kWh example at the temporary 0% residential rate. Your survey replaces it.
Will it stay on in a power cut?
Only if a gateway or essential-load board was designed and paid for. A standard grid-tied battery turns off with the grid. On this 10 kWh example the inverter is 3.6 kW, and backup is still a separate line.
What paperwork should I keep?
Keep the MCS certificate where the job is certified, the electrical certificate, the DNO record, the schematic, the warranty registration and a photo of the schedule. For an illustrated £6,880 job, that folder is part of what you bought.
What if the cheap rate is not 7p?
Then the figure changes. This page used 11.0p as a charge rate and 29.6p as the rate avoided. A smaller gap means a worse payback. Read the live tariff.
Sources
Want a price for your house?