Local Battery Installers Get a quote
  1. Front
  2. Guides
  3. Sunsynk hybrid for a no solar in Swansea

Places · Case file

Sunsynk hybrid for a no solar in Swansea

Updated

Solar panels on a British slate roof
Solar panels on a British slate roof

With no useful roof, a Sunsynk hybrid in Swansea earns money only if the charge rate stays well below the rate avoided later. Treat Sunsynk hybrid here as a tariff tool for Swansea, or do not fit it.

Sunsynk hybrid on a no solar in Swansea

Slope and salt are the local extras. A flat inland quote with mileage added is incomplete, which is the constraint I would write next to Sunsynk hybrid for this no solar.

National Grid Electricity Distribution covers this Swansea example. A 4 kWp-class roof at 1000 kWh per kilowatt is about 4,000 kWh a year before shade, and Sunsynk hybrid does not change that weather.

Money for Sunsynk hybrid for a no solar in Swansea

Take a 10 kWh pack, cycled about 260 times, at 90% round trip. Charge at 11.0p, and value what comes back at 26.0p. Export given up is priced at 4.0p. About 1486 kWh a year of the charge is treated as spare solar from 4 kWp that might otherwise have been exported. Delivered energy is about 2340 kWh. After charging cost and lost export, the figure saves about £438 a year. Set that against £6,880 fitted, which is a September 2026 illustration at the temporary 0% residential rate, not a quote. That is a simple payback of about 15.7 years on these assumptions. Nudge the night rate up by 4p and see if you still like it.

Where the job is a qualifying install in a home, the 0% rate runs to 31 March 2027 and is due to become 5% after that. This figure prices the work at £6,880 on that basis. It does not apply to a shop, and it does not apply to a battery you buy and fit yourself.

Connection for Sunsynk hybrid for a no solar in Swansea

In Swansea, on National Grid Electricity Distribution, 3.6 kW is in the band where G98 connect-and-notify is often enough. Export can still be capped. Agree that before the inverter is ordered. The figure uses 10 kWh and 4 kWp, which is enough to tell two quotes apart if they assumed something else.

In Swansea, the weak case for Sunsynk hybrid is simple: Anyone who wants a single manufacturer to phone for every part of the system.

Would I proceed with Sunsynk hybrid for a no solar in Swansea?

I would not pay the bulk of £6,880 before the DNO route for a 3.6 kW inverter is known.

I would proceed on Sunsynk hybrid for a no solar in Swansea only after the cupboard, the 3.6 kW connection route and the tariff gap are written down.

Common questions

Is the price on this page a quote?

No. £6,880 is a September 2026 illustration for a 10 kWh example at the temporary 0% residential rate. Your survey replaces it.

Will it stay on in a power cut?

Only if a gateway or essential-load board was designed and paid for. A standard grid-tied battery turns off with the grid. On this 10 kWh example the inverter is 3.6 kW, and backup is still a separate line.

What paperwork should I keep?

Keep the MCS certificate where the job is certified, the electrical certificate, the DNO record, the schematic, the warranty registration and a photo of the schedule. For an illustrated £6,880 job, that folder is part of what you bought.

What if the cheap rate is not 7p?

Then the figure changes. This page used 11.0p as a charge rate and 26.0p as the rate avoided. A smaller gap means a worse payback. Read the live tariff.

Sources

Want a price for your house?

The figures above are a rough guide. An installer still needs to see your fuse board, where the battery will go, and whether you want power during a blackout.

Get a quote
Get a quote