A Sigenergy SigenStor installation puts an energy controller (a hybrid inverter) on the floor or wall with one to six battery modules of 6.02 kWh or 9.04 kWh stacked on it, plus an optional EV DC charging module and a Sigen Gateway if you want backup. Sigenergy's spec page lists single-phase controllers from 3 to 12 kW and three-phase from 5 to 30 kW, so on a single-phase supply anything above 3.68 kW usually needs a G99 application to the network operator before the install. To find an installer in Manchester or elsewhere, send one request through our battery quotes form and check each firm's MCS status and consumer code membership yourself.

  • Sigenergy's spec page, checked 28 November 2026, lists battery modules of 6.02 kWh and 9.04 kWh, LiFePO4, IP66, floor standing or wall-mounted, with one to six on a controller.
  • Single-phase controllers run from 3 to 12 kW and three-phase from 5 to 30 kW, with two to four solar MPPTs.
  • G98 covers up to 3.68 kW single phase and 11.04 kW three phase, per Electricity North West, the network operator for Manchester. Above that the installer applies under G99 before fitting.
  • Backup needs a Sigen Gateway. Sigenergy's gateway page lists five home models, and only the HomePro SP-F is described with 100 A whole-home backup on a single-phase supply.
  • Price is covered in our separate Sigenergy fitted cost guide. This page covers the hardware, the paperwork and the installer.

What a SigenStor system is, from Sigenergy's own pages

Sigenergy describes SigenStor as five parts in one system: a solar inverter, an EV DC charger, the battery power converter, the battery pack and the energy management software. In practice the installer fits an energy controller, stacks battery modules under or beside it, and adds the EV charging module only if you order one. Sigenergy's product page says the modules use guided connectors that plug in as they are stacked, and it gives figures of 15 minutes for stacking and 5 minutes for commissioning. Those are the maker's figures for the stack itself, not for the whole job, which also includes isolation, cabling and the network paperwork.

The figures below come from Sigenergy's specification page, which we read on 28 November 2026. It is the English page Sigenergy serves for Europe and global markets, so ask the installer to confirm the exact UK part numbers on your quote. We have not tested a SigenStor ourselves.

SigenStor parts, from Sigenergy's spec page (checked 28 Nov 2026)
PartSingle phaseThree phase
Energy controller output3 to 12 kW5 to 30 kW
Output voltage220 to 240 V380 or 400 V
Solar MPPTs2 to 42 to 4
Battery modules per controller1 to 61 to 6
Battery module energy6.02 or 9.04 kWh6.02 or 9.04 kWh
Module charge and discharge power3 or 4.6 kW3 or 4.6 kW
EV DC charging module12.5 or 25 kW, CCS212.5 or 25 kW, CCS2

Step 1: the survey and where the stack can go

The survey checks the consumer unit, the meter tails, the earthing, any existing solar inverter and the spot for the stack. Sigenergy lists every part at IP66 and says the battery can be floor standing or wall-mounted, so an outside wall or a garage is usually on the table. A floor-standing stack of several modules is tall and heavy, so check the floor is level and solid and that the route from the van is clear.

Siting is also a fire safety question. BSI's PAS 63100:2024 sets out where home batteries should and should not go, and our guide to battery location and fire rules explains it. If the quote puts the stack inside the house, ask the installer to say in writing how that location meets the PAS.

  • Where will the controller and modules sit, and on the floor or the wall?
  • How long is the cable run to the consumer unit and the meter?
  • Does the existing solar inverter stay, or do the panels move onto the SigenStor's own MPPTs?
  • Is there a sound internet connection at the stack for the mySigen app and updates?

Step 2: single phase or three phase

Most UK houses have a single-phase supply, and the single-phase controller is the one that fits it. Sigenergy's range there runs from 3 to 12 kW of output. A house with a three-phase supply can take a three-phase controller from 5 to 30 kW, which suits large homes, a heat pump plus an EV, or a big roof array spread over several MPPTs.

The controller size should follow your supply and your loads, not the biggest number in the brochure. A bigger controller can move the job from G98 into G99 and needs a matching protective device in the consumer unit. Our single phase vs three phase battery guide explains how to check which supply you have.

Step 3: G98 or G99 by controller size

Electricity North West, the network operator for Manchester and the rest of the North West, says G98 connect and notify covers up to 16 amps per phase: 3.68 kW on a single-phase system and 11.04 kW on a three-phase system, measured on the inverter's continuous steady state rating. Anything larger falls into a G99 application.

GOV.UK's guidance on registering energy devices sets the timings. Under G98 the installer fits first and notifies the network operator within 28 days. Under G99 the installer applies before installing, and the network operator has up to 45 days to respond for a low-voltage device. A fast-track form for battery storage fitted with generation, G99 Form A1-2, cuts that to 10 days or less. GOV.UK also says the owner should confirm the network operator received the notification, and for G99 that it agreed before work starts.

Which route a SigenStor controller is likely to take
SupplyControllerLikely route
Single phase3 kWG98, notify within 28 days
Single phaseAbove 3.68 kWG99, apply before fitting
Three phaseUp to 11.04 kWG98, notify within 28 days
Three phaseAbove 11.04 kWG99, apply before fitting

Step 4: the EV DC charging module

The EV option is what sets SigenStor apart from most home batteries. Sigenergy's spec page lists a DC charging module at 12.5 kW or 25 kW, with a CCS2 connector, an output range of 150 to 1,000 V, and RFID card, app or no authentication. It sits in the same stack as the battery and the solar inputs, so it is a different job from fitting an ordinary AC wallbox on its own circuit.

It still counts as an EV charger for the network operator. GOV.UK says EV chargers go through the ENA application form for EVs and heat pumps, with the make and model checked against the ENA charge point database, and that vehicle-to-grid chargers must be installed under G98 or G99 depending on capacity. Sigenergy's 2023 UK launch release said the module would support supplying the home from the car and exporting to the grid; if that matters to you, ask the installer whether your car and the UK version of the module support it today. Our guide to a battery and EV charger together covers the wider choice.

Step 5: backup and the Sigen Gateway

Without a gateway, SigenStor stores and releases energy but the house goes dark in a power cut like any other. Sigenergy's Home Energy Gateway page lists five home models and claims 0 ms load-side disruption for the family. Only the HomePro SP-F is described with 100 A on both the grid and backup ports, which is what whole-home backup on a typical single-phase supply needs; the others suit a smaller backed-up board. The page also says the gateway can start and control a diesel generator.

Ask which gateway is in the quote, what sits on the backed-up side, and how it suits your earthing. Our whole home backup versus essential loads guide helps you choose, and the backup gateway cost guide covers what the extra wiring involves.

Sigen Gateway home models, from Sigenergy's gateway page (checked 28 Nov 2026)
ModelPhaseRated powerSigenStor units
Gateway HomeSingle12 kW1
Gateway HomeThree30 kW1
Gateway HomeProSingle12 kW totalUp to 2
Gateway HomePro SP-FSingle22 kWUp to 2
Gateway HomeProThree30 kW1

Step 6: installation day and handover

On the day the installer isolates the supply, mounts the controller and modules, runs the AC and DC cables, fits the gateway if there is one, and commissions the system in the mySigen app. Plan for the power to be off for part of the day and ask for a time estimate in advance.

At handover, keep the electrical installation certificate, the G98 notification or G99 acceptance, the MCS certificate where the job is certified, the serial numbers of every module and the controller, and the warranty registration. Warranty terms are in our Sigenergy warranty and support guide.

How to find a Sigenergy installer in Manchester or anywhere in the UK

Sigenergy has a Find an Installer map on its website. When we checked it on 28 November 2026, its region list offered Global, Europe (not including the UK), Asia Pacific, Latin America, the Middle East and Africa, and North America, so UK users need the Global view. A name on the map shows who can buy and commission the kit, not how good their work is.

The simplest route is one request through our battery quotes form, which passes it to installers who cover your postcode. In Greater Manchester, our Manchester page covers Electricity North West, local housing and siting, and the Sigenergy with a heat pump in Manchester brief works through a local example. We do not recommend individual firms, so check each one yourself.

We also have SigenStor briefs for other homes and towns: with an electric car in Brighton, Cardiff and Salford; added to existing solar in Coventry, Milton Keynes and Wolverhampton; with a heat pump in Exeter, Plymouth and Sheffield; and for large detached houses in Aberdeen, Leeds and Nottingham.

  • MCS: MCS says to check an installer's status on its Find an Installer tool when you get the quote, before you sign and before work starts.
  • Consumer code: check membership on RECC's Find a member page.
  • Experience: ask how many SigenStor systems they have commissioned, with which controller and gateway, and which network operator they applied to.

What to ask for in a SigenStor quote

A clear quote lets you compare two firms on the same system. Ask for each of these as a written line, then read the Sigenergy fitted cost guide to see what each line tends to add, and our guide to comparing battery quotes for the rest of the checklist.

  • Controller part number, kW rating and phase, plus the number and size of battery modules
  • Usable kWh, since Sigenergy's spec page gives total energy per module
  • Which Sigen Gateway, if any, and which circuits are backed up
  • The EV DC charging module as its own line, at 12.5 or 25 kW
  • G98 or G99, who submits it, and whether the fast-track form applies
  • Where the stack goes and how that meets PAS 63100
  • MCS certificate, Part P notification and warranty registration

Frequently asked questions

What sizes does a Sigenergy battery come in?

Sigenergy's spec page, checked 28 November 2026, lists SigenStor battery modules of 6.02 kWh and 9.04 kWh total energy, with one to six on each energy controller. Older documents mention 5 kWh and 8 kWh modules, so check which one your quote names.

Is Sigenergy available in the UK?

Yes. Sigenergy launched SigenStor in the UK in October 2023, according to its own news release from Birmingham, and it is sold and fitted through installers rather than direct to homeowners.

Does a Sigenergy install need G99?

Often. Electricity North West puts the G98 limit at 3.68 kW on a single-phase supply and 11.04 kW on three phase. Sigenergy's single-phase controllers start at 3 kW and go up to 12 kW, so most sizes above the smallest need a G99 application before fitting.

Can a Sigenergy battery keep the house on in a power cut?

Only with a Sigen Gateway. Sigenergy lists five home gateways; the HomePro SP-F is the single-phase model described with 100 A ports for whole-home backup. What stays on depends on what the installer wires to the backed-up side.

How do I find a Sigenergy installer near Manchester?

Send one request through our battery quotes form or use the Global view of Sigenergy's Find an Installer map, then check each firm's MCS status and consumer code membership. Manchester is on the Electricity North West network, which handles the G98 or G99 paperwork.

Can the Sigenergy EV charger be added later?

The EV DC charging module is a separate part of the stack, so it can be priced as its own line. Ask the installer whether your controller and gateway support adding it later, and whether that would need fresh network paperwork.

Want a real price for your home?