Calculator

Who is my DNO? Postcode lookup and G98/G99 checker

What is a DNO?

A Distribution Network Operator owns and runs the cables that bring electricity to your home. It is not your energy supplier. Great Britain has six DNO groups covering fourteen regions, and Northern Ireland has one. Your DNO is the company that has to be told about, or approve, any solar panels, battery or EV charger connected at your address.

UK Distribution Network Operators
DNOAreas coveredGuide
UK Power NetworksLondon, the South East and the East of EnglandBattery connection guide
National Grid Electricity DistributionThe Midlands, the South West and South WalesBattery connection guide
SSENCentral southern England and the north of ScotlandBattery connection guide
Northern PowergridThe North East and YorkshireBattery connection guide
Electricity North WestGreater Manchester, Lancashire and CumbriaBattery connection guide
SP Energy NetworksCentral and southern Scotland, Merseyside, Cheshire and North WalesBattery connection guide
NIE NetworksNorthern IrelandBattery connection guide

G98 or G99: which applies to you?

G98 covers small generators up to 16 amps per phase. That is 3.68 kW on a single-phase supply, or 11.04 kW across three phases. Your installer connects the system and notifies the DNO within 28 days. Anything larger needs a G99 application, and the DNO must approve it before the system is switched on. If you already have solar, the DNO looks at the combined capacity of the solar inverter and the battery inverter. Read G98 and G99 for home batteries and export limitation.

How accurate is the lookup?

The tool matches your postcode area to the DNO that serves it. Postcodes close to a boundary between two networks can sit on either side, so confirm with the Energy Networks Association's postcode search or your installer before any application is submitted. In an emergency or power cut, call 105 from any phone in Great Britain to reach your network operator.