Quick answer

Choose an installer who is MCS certified for the technology you are buying, belongs to a consumer code such as RECC or HIES, surveys the home in person or with detailed photos, names every piece of equipment on the quote, and offers an insurance-backed workmanship warranty. Get at least two or three quotes, protect any deposit, and walk away from pressure selling.

  • MCS certification is needed for the Smart Export Guarantee
  • Consumer code membership gives a complaints route and deposit protection
  • The quote should name panel, inverter and battery models and sizes
  • Compare two or three quotes on the same specification

The checks that matter

Most problems with solar and battery jobs come from a handful of gaps. These checks catch them before you sign.

  • MCS certification for solar PV and, if relevant, battery storage; check it on the MCS website
  • Membership of a consumer code such as RECC or HIES
  • A survey that looks at the roof, the consumer unit, the meter position and where the battery will go
  • A shading assessment and a generation estimate with its assumptions shown
  • Exact panel, inverter and battery models, sizes and quantities on the quote
  • Who handles network operator notification or G99 approval
  • Scaffold, bird mesh, isolators and any consumer unit upgrade listed
  • Workmanship warranty length and whether it is insurance-backed
  • Deposit size and how it is protected
  • Handover documents: MCS certificate, electrical certificate and warranties

Comparing quotes fairly

Put quotes side by side on usable battery kWh, inverter kW, panel count and wattage, and the extras included. A cheaper quote often leaves out scaffold, bird mesh or the network application. For the solar side, how to compare solar panel quotes turns each quote into cost per kWp and per forecast kWh. See compare home battery quotes and battery quote exclusions.

Generation estimates should follow the MCS method. Be wary of savings claims that assume you use all of your solar or that energy prices rise every year.

Green flags and red flags
Green flagRed flag
Named models and sizes on the quote'Premium panels' with no model
Survey before a firm priceFixed price from a phone call
Deposit protected under a consumer codeLarge deposit paid to the salesperson
Clear network application plan'You don't need to tell anyone'
Time to decideToday-only discount

Local installers and national firms

Local installers often give faster aftercare and know the network operator's habits. National firms may have better buying power. Either can be good; the checks above matter more than size.

Ask who will actually do the work. Some firms sell the job and pass it to a subcontractor. That is not wrong in itself, but you should know who is on your roof, who signs the certificates and who you call when something goes wrong in year three. Ask too how long the installer has been trading and for two or three recent customers you can contact.

Find certified installers near you on our location pages or request quotes. For solar in your area, see solar panel installers near you.

Checking an installer in ten minutes

None of these checks takes long, and together they rule out most of the problems people report: companies that close mid-job, subcontracted work nobody takes responsibility for, and paperwork that never arrives.

  • Search the company on the MCS installer search and confirm it covers solar PV and, if you want one, battery storage
  • Check the consumer code: RECC and HIES both list members, and membership gives you a dispute route
  • Look up the company on Companies House: trading history, directors and any recent change of name
  • Ask for the name of the person who will sign the electrical certificate
  • Ask who provides the insurance-backed guarantee and how long it lasts
  • Ask for two customers from the last 12 months you can call

What a good generation estimate looks like

A quote should give a yearly generation figure and show where it came from. The MCS method uses the roof's direction, pitch, postcode zone and a shade factor. Check the figure against an independent model.

For example, a Cardiff household quoted for 4 kWp on a south roof at 35 degrees can check it in PVGIS, the European Commission's tool, which gives about 4,040 kWh a year with no shade. A quote promising 4,800 kWh from that roof would need a very good explanation. A quote claiming far more than PVGIS for your roof, without a reason, is a warning sign.

Frequently asked questions

Does my solar installer need to be MCS certified?

Yes if you want export payments under the Smart Export Guarantee, which requires an MCS certificate for the installation.

How many quotes should I get?

Two or three, on the same specification, so you can compare like with like.

How much deposit should I pay?

Keep it modest and make sure it is protected under the installer's consumer code. Avoid paying large sums before installation.

What paperwork should I get after installation?

The MCS certificate, an electrical installation certificate, warranty documents, network operator confirmation and the system manuals.

How can I check a solar generation estimate?

Run your roof through PVGIS, the free European Commission tool, or our solar panel calculator, and compare the yearly kWh with the installer's figure.

Want a real price for your home?

Figures here are a guide. An installer still needs to see your fuse board, where the battery will go and whether you want backup. Tell us your postcode and local installers will quote.

Get free quotes

Related guides

Sources