Quick answer
To compare solar panel quotes, rewrite each one in the same units: system size in kWp, the exact panels and inverter, the forecast kWh a year and how it was worked out, and what is included. Then divide the price by kWp and by forecast kWh, check each forecast against the free PVGIS tool, and confirm MCS certification, consumer code membership, deposit protection and who handles the DNO application. The cheapest headline price is not always the best value; line these up first.
- Line up every quote on kWp, panel and inverter models, forecast kWh and what is included before looking at price.
- Cost per kWp and cost per forecast kWh are the two fairest normalisers; check each forecast against PVGIS.
- MCS installers must give the forecast in a set format (kWp multiplied by Kk multiplied by a shade factor) before you sign.
- Under the RECC Code a deposit should not exceed 25% and must be insured; Citizens Advice gives the same 25% limit.
- Residential solar and battery installs are zero-rated for VAT until 31 March 2027, and SEG export payments need certification evidence, usually the MCS certificate.
Step 1: put every quote into the same units
Quotes rarely use the same layout, so the first job is to copy the key facts from each into one table. Citizens Advice and MCS both suggest getting at least three quotes, and three is enough to see which figures are out of line.
Under the RECC Consumer Code, a member's quotation must itemise the goods and services, show prices with VAT, list anything not included, set out the payment timetable and include the performance estimate. If a quote is missing one of these, ask for it in writing before comparing.
- Total system size in kWp. MCS counts this as the sum of the label wattage of every panel, so 10 panels at 430 W is 4.3 kWp.
- Panel make, model and wattage, so you can compare datasheets rather than brand names.
- Inverter make, model and AC rating, and whether it is a hybrid that can take a battery now or later.
- Forecast kWh a year, plus the inputs behind it: postcode zone, pitch, orientation and shade factor.
- Extras: scaffolding, bird proofing, optimisers, monitoring, isolators and any making good.
Step 2: check the forecast, then normalise the price
MCS standard MIS 3002 sets the forecast method: annual output equals kWp multiplied by Kk multiplied by SF, where Kk is a kWh per kWp figure taken from tables for your postcode zone, roof pitch and orientation, and SF is a shade factor. A shade factor of 1.00 is only allowed where there is a clear horizon with no shading. Self-consumption is estimated separately using MCS guidance MGD 003, and the estimate must be given before the contract is awarded. MCS also requires it to say the figure is guidance for the first year and not a guarantee.
You can sense-check each forecast yourself with PVGIS, the European Commission's free PV tool, which needs no registration. Enter your address, the quoted kWp, the roof slope and the azimuth (0 is south, 90 is west, minus 90 is east). PVGIS uses a default 14% system loss and shows yearly output and how much it varies between years. If one quote forecasts far more kWh per kWp than PVGIS and the other two, ask the installer which Kk value and shade factor they used. Our guide on how much electricity a solar panel produces explains the factors behind the figure.
Once the forecasts are credible, divide each total price by kWp and by forecast kWh. Cost per kWp shows what you pay for capacity; cost per forecast kWh shows what you pay for output on your roof. The example below uses made-up round numbers to show the arithmetic only. They are not market prices.
| Line | Quote A | Quote B | Quote C |
|---|---|---|---|
| System size | 4 kWp | 5 kWp | 4 kWp |
| Total price (example) | £8,000 | £9,000 | £7,000 |
| Forecast output (example) | 3,400 kWh | 3,600 kWh | 4,000 kWh |
| Cost per kWp | £2,000 | £1,800 | £1,750 |
| Cost per forecast kWh | £2.35 | £2.50 | £1.75 |
| Forecast kWh per kWp | 850 | 720 | 1,000 |
Reading the worked example
In this invented example, Quote B is cheaper per kWp than A, but the most expensive per forecast kWh, because its larger array includes shaded panels. Quote C looks best on both measures, but its output per kWp is well above the other two, so it is the forecast to query first. If C used a shade factor of 1.00 on a shaded roof, its real cost per kWh would be higher. Treat cost per forecast kWh as a comparison ratio, not a payback figure.
Step 3: compare the extras and the grid paperwork
Extras are where like-for-like quotes drift apart. Check whether scaffolding and bird proofing are included or excluded, and whether one quote adds optimisers or microinverters where another does not. RECC members must list items not included and any site conditions that could lead to extra charges.
Every grid-connected system needs the local network operator (DNO) to be told. Under the ENA connection guide, systems with a combined registered capacity up to 16A per phase (3.68 kW on a single-phase supply) fall under G98, and the installer must notify the DNO within 28 days of commissioning. Larger systems fall under G99, which means an application to the DNO and a connection offer. The RECC Code requires members to explain the DNO requirements and agree who is responsible before the contract. Compare the inverter AC rating on each quote with that threshold, and see our grid connection pack if you face a G99 application.
Step 4: compare certification and protection
Check each installer on the MCS Find an Installer search, and confirm the panels and inverter are MCS certified products. MCS refers to RECC and HIES as CTSI approved consumer codes an installer may belong to; check membership on the code's own site. MCS is the single point of contact for complaints about MCS certified installers.
Under the RECC Code, a deposit should not exceed 25% of the estimated cost, deposit plus any further advance payment must not exceed 60%, and both must be insured. Members must also give a written workmanship guarantee of at least two years, transferable if you move, backed by insurance in case the firm stops trading. HIES lists deposit and stage payment protection and insurance backed guarantees among its homeowner services. Write each quote's deposit, stage payments and final payment trigger into your table.
VAT should not differ between quotes. GOV.UK VAT Notice 708/6 zero-rates the installation of solar panels, including the inverter and cabling, in residential accommodation from 1 May 2023 to 31 March 2027, and battery installs and retrofits from 1 February 2024 within the same relief. Panels supplied without installation are standard-rated. If installation will fall after 31 March 2027, ask how VAT will be charged, because the temporary 0% rate ends that day.
To be paid for exports under the Smart Export Guarantee, Ofgem says solar systems up to 50kW must show the installation and installer are suitably certified, which in practice means the MCS certificate. MCS adds that you need a smart meter recording exports. If a quote includes a battery, use our battery quote comparison guide for that part.
Comparison table template
Copy this table into a spreadsheet or onto paper and fill in one column per quote. Any blank cell is a question to send the installer.
| Line | Quote A | Quote B | Quote C | What to check |
|---|---|---|---|---|
| Total kWp | Sum of panel label wattages | |||
| Panels (make, model, W) | Datasheet, MCS certified product | |||
| Inverter (make, model, kW) | Hybrid or battery-ready; combined AC rating with any battery vs 3.68 kW single phase or 11.04 kW three phase | |||
| Forecast kWh a year | Kk, shade factor shown; compare with PVGIS | |||
| Total price inc. VAT | VAT at 0% if installed by 31 March 2027 | |||
| Cost per kWp | Price divided by kWp | |||
| Cost per forecast kWh | Price divided by forecast kWh | |||
| Scaffolding | Included, excluded or provisional | |||
| Bird proofing | Included or extra | |||
| Optimisers | Which panels, and why | |||
| DNO G98 or G99 | Which applies and who submits it | |||
| MCS certificate | Installer on MCS Find an Installer | |||
| Consumer code | RECC or HIES, checked on code's site | |||
| Deposit and stages | 25% or less, insured | |||
| Workmanship warranty | Insurance-backed, length, transferable | |||
| Quote valid until | Date and conditions |
Red flags
The RECC Code lists high-pressure selling techniques its members must not use, and Citizens Advice warns against cold callers and large upfront payments. Treat any of these as a reason to pause.
- A sales visit lasting more than two hours (RECC).
- A high first price followed by a discount for signing on the day (RECC).
- Price withheld until the end of the visit (RECC).
- Unrealistic forecasts of future energy price rises, or claims that stock is limited (RECC).
- A deposit above 25%, or no insurance for it (RECC, Citizens Advice).
- A company that cold called you (Citizens Advice).
- No written performance estimate, or one with a shade factor of 1.00 on a shaded roof (MCS MIS 3002).
G98 and G99 paperwork
Not sure which form your system needs?
The free route finder works out whether your solar or battery is G98, or G99 SGI-1, SGI-2 or SGI-3, from the inverter sizes. The £19 pack then fills in the form data, the evidence checklist and the letters for your network operator.
Frequently asked questions
How many solar panel quotes should I get?
Citizens Advice and MCS both advise getting at least three. Three quotes let you see which forecast or price is out of line with the other two.
Why compare cost per kWp and cost per kWh?
Cost per kWp compares what you pay for capacity, regardless of system size. Cost per forecast kWh adds your roof's shading and orientation, so it shows which quote buys the most output. Use both, and only after checking each forecast is realistic.
How do I check an installer's generation forecast?
Ask for the MCS calculation: kWp, postcode zone, pitch, orientation, Kk value and shade factor. Then run PVGIS, which is free, with the same kWp, slope and azimuth. A forecast well above PVGIS and the other quotes needs an explanation.
Who applies to the DNO for solar panels?
Under G98, for systems up to 16A per phase, the installer must notify the DNO within 28 days of commissioning. Larger systems come under G99, which involves an application and connection offer. The RECC Code requires members to agree in writing who is responsible before you sign.
Is there VAT on solar panels in 2026?
Installation of solar panels and batteries in residential accommodation is zero-rated until 31 March 2027, according to GOV.UK VAT Notice 708/6. Panels bought without installation are standard-rated.
Want a real price for your home?
Figures here are a guide. An installer still needs to see your fuse board, where the battery will go and whether you want backup. Tell us your postcode and local installers will quote.
Related guides






Sources
- GOV.UK: VAT on energy-saving materials and heating equipment (VAT Notice 708/6)
- Ofgem: Smart Export Guarantee, generators
- Ofgem: SEG Guidance for Generators
- MCS: Smart Export Guarantee for consumers
- MCS: Consumer homepage and Find an Installer
- MCS: Your renewable installation
- MCS: What to do if things go wrong
- MCS: MIS 3002 Solar PV Standard, version 6.0
- RECC: Renewable Energy Consumer Code
- HIES consumer protection scheme
- Citizens Advice: Find an installer for energy efficiency home improvements
- European Commission JRC: PVGIS
- PVGIS online tool
- PVGIS user manual
- ENA Distributed Generation Connection Guide, March 2026 (via Northern Powergrid)
- National Grid: Micro generation single premises (G98)