Quick answer
A 10 kWp solar system is about 24 panels of 430 watts and, in our PVGIS 5.3 run, generates roughly 8,600 kWh a year in Glasgow and 11,600 kWh in Brighton on an unshaded south roof. Split across east and west roofs it makes about 78% of that. The network paperwork depends on the inverter, not the panels: a 10 kWp array on an inverter of 7.36 kW or less can use a G99 fast track route, while a single 10 kW inverter needs a full G99 application.
- Panel rating (kWp) and inverter rating (kW) are different numbers, and the network operator looks at the inverter
- Our PVGIS run: about 8,600 to 11,600 kWh a year for 10 kWp facing south, by city
- East and west roofs give about 78% of a south roof at the same tilt in our PVGIS run
- SSEN's fast track page caps each inverter or battery at 7.36 kW, and the total of all units at 14.72 kW
- A 10 kWp system can export under the Smart Export Guarantee, which covers solar up to 5 MW
What 10 kWp actually generates
Many pages describe a 10 kW system without saying how much it makes. On 25 November 2026 we ran the European Commission's PVGIS 5.3 calculator for 10 kWp of crystalline silicon panels at 35 degrees with 14% system losses and no shading, in five cities, once facing south and once facing west. Facing east gives a near identical result to west.
The yearly figure divided by 10 gives kWh per kWp, which is the number to compare against any installer forecast. A forecast far above these figures on an unshaded roof deserves a question.
| City | South, kWh a year | West, kWh a year | West as a share of south |
|---|---|---|---|
| Brighton | 11,558 | 9,042 | 78% |
| London | 10,189 | 7,870 | 77% |
| Birmingham | 9,680 | 7,564 | 78% |
| Manchester | 8,861 | 7,017 | 79% |
| Glasgow | 8,588 | 6,866 | 80% |
How many panels make 10 kW
Panels are sold by watts, so the count depends on the model. At 430 watts, 23 panels make 9.89 kWp and 24 make 10.32 kWp. At 400 watts you need 25. Most installers quote the exact total, such as 9.84 kWp or 10.32 kWp, rather than a round 10.
To check that the roof can take them, multiply the panel count by the area on the datasheet and compare it with the usable roof once you allow for the gap needed at the edges and ridge. A surveyor will measure this, and it is often the real limit on a terraced or semi-detached house. Our solar panels hub and solar planning checker are a good start before you ask for quotes.
Why the inverter decides the paperwork
The panel total is not what the network operator assesses. It looks at the rated output of each inverter and battery at the property, converted to amps at 230 volts. Our guide to G98 and G99 for home batteries explains the limits in full. On a single-phase supply, 16 A is 3.68 kW and 32 A is 7.36 kW.
That gives a 10 kWp array several possible routes. Using the categories on SSEN's G99 fast track page, checked on 25 November 2026:
- Small Generation Installation 1: each unit and the total at 16 A (3.68 kW) or less, notify only
- Small Generation Installation 2: each unit at 32 A (7.36 kW) or less with a registered capacity of 16 A, total up to 32 A (7.36 kW), and an export limit to 3.68 kW may be required
- Small Generation Installation 3: each unit at 32 A (7.36 kW) or less, total registered capacity up to 60 A (14.72 kW), and an export limit to 7.36 kW may be required
- A single inverter above 7.36 kW falls outside these fast track categories and needs a standard G99 application, which is slower
Choosing between one big inverter and a smaller one
A 10 kWp array does not need a 10 kW inverter. Installers often pair it with an inverter below the array rating, because panels seldom reach their full rating and a smaller inverter costs less. The trade is a little lost output on the sunniest summer middays, which our PVGIS figures do not model.
Adding a battery later counts towards the totals. A 6 kW solar inverter and a 5 kW battery inverter come to 11 kW, which is within SGI-3's 14.72 kW total but pushes the application from notify-after to approve-first. The grid connection pack walks through the forms, and the DNO lookup finds your network operator.
Planning, export income and who it suits
Roof solar on a house is often permitted development, but the Planning Portal says there are limits and conditions, and a local authority can confirm them. Read solar panels and planning permission before you rely on it, especially in a conservation area.
Export is paid under the Smart Export Guarantee, which Ofgem says suppliers must offer to solar generators up to 5 MW. A 10 kWp system qualifies. How much you earn depends on the tariff you pick, not on the system size.
At 8,600 to 11,600 kWh a year, a 10 kWp system suits a large household, an electric vehicle and heat pump, or a home office. A smaller home with modest use will export most of it. If your roof is split, see east-west solar panels for how to size each side, and use the battery backup time tool to see what storage does for the evening.
Questions to put to an installer
A 10 kWp quote is easy to compare once you ask for the same few numbers from each firm. Our guide to comparing solar panel quotes has a template table for three quotes.
- What is the panel total in kWp and the inverter rating in kW, and is the system single or three phase?
- Which G98 or G99 route applies, and who submits the application and when?
- What yearly generation do you forecast, and what shading did the survey find?
- Will an export limit be needed, and does it reduce my output?
- Can a battery be added later without changing the inverter?
G98 and G99 paperwork
Not sure which form your system needs?
The free route finder works out whether your solar or battery is G98, or G99 SGI-1, SGI-2 or SGI-3, from the inverter sizes. The £19 pack then fills in the form data, the evidence checklist and the letters for your network operator.
Frequently asked questions
How much does a 10 kW solar system produce in the UK?
In our PVGIS 5.3 run, 10 kWp facing south at 35 degrees made about 8,600 kWh a year in Glasgow, 9,700 in Birmingham and 11,600 in Brighton. East or west roofs make about 78% of that.
How many solar panels is 10 kW?
About 24 panels of 430 watts gives 10.32 kWp, or 25 panels of 400 watts gives 10 kWp. The exact count depends on the panel you choose.
Does a 10 kW solar system need G99 approval?
It depends on the inverter. An inverter above 3.68 kW per phase needs G99. SSEN's fast track pages allow units up to 7.36 kW, while a single inverter above that needs a standard G99 application.
Can I fit 10 kW of panels on a 5 kW inverter?
Yes, installers often do this. The network operator assesses the inverter rating, and your installer can explain the small loss on the sunniest middays.
Can I get paid for exporting from a 10 kW system?
Yes. Ofgem's Smart Export Guarantee covers solar generators up to 5 MW, so licensed suppliers who run a tariff must offer one to a 10 kWp system.
Want a real price for your home?
Figures here are a guide. An installer still needs to see your fuse board, where the battery will go and whether you want backup. Tell us your postcode and local installers will quote.
Related guides






Sources
- European Commission JRC: PVGIS 5.3 PV performance calculator
- European Commission JRC: PVGIS user manual
- SSEN: G99 fast track process
- National Grid Electricity Distribution: fast track (G99)
- Ofgem: Smart Export Guarantee guidance for generators
- Planning Portal: solar panels and planning permission
- MCS Certified